23rd May

Continuing work inside while the weather's bad- rewiring, sanding and painting the floorboards, making a new controll pannel, varnishing and epoxying drawings into the table and (trying) to clean up a bit.















Comments

Popular posts from this blog

Across the Channel for Paimpol festival

Back across the Channel

Engine failure and a Channel crossing